
Installation of power and control wiring to air handling unit.

Wiring air con units

Testing emergency lights



100A three phase buzz bar tap-off

grid ceiling once the insulation has been installed

Leggett & Platt


Installation of power and control wiring to air handling unit.

Wiring air con units

Testing emergency lights



100A three phase buzz bar tap-off

grid ceiling once the insulation has been installed

Leggett & Platt
