Wembley Stadium
- ClientWembley Stadium
- Date9 June 2020
- TaskOne of the UK network providers was experiencing some issues with their in-building coverage system at Wembley stadium. SEC were asked if they could do a detailed power survey on the supply to the network equipment. SEC installed specialist data logging equipment on multiple power distribution cabinets and monitored the output over a month long period. It was then possible to look at potential spikes in power consumption during major events at the stadium. The detailed report produced by SEC was then used to even power distribution on the network.